Pouring of floors and sill plates.
Supply of concrete F’c of 150, 250, 300, and TS.
Pouring of sill plates, eaves and retaining walls.
We supplied 1200 m³ of concrete F’c 200 kg/cm² at 28 days, 20mm aggregate. 10 and 14 cm Rev. natural grey and black rust pigmentation.
We poured the structural elements, such as walls, plates and columns.
We also supplied ready-mix concrete F’c 350 kg/cm² at 28 days, 10 mm aggregate, Rev. 16 cm. Mocha color pigmentation and pumped to 42 m with a telescopic pump.
Pouring of CLSM (Controlled-low-strength-material).
Pouring of rainwater harvesting platforms.
We supplied 2000 m³ of F’c ready-mix concrete, 600 kg/cm² at 28 days, 20mm aggregate, 18 cm Rev. Durable concrete with a maximum permeability of 1000 coulombs at 90 days.
Pouring of sill plates and eaves.
We supplied 3500 m³ of concrete F’c 250 kg/cm² at 28 days, 20 mm of limestone aggregate. 10 and 14 cm Rev. Sulfate-resistant
We poured concrete for the dredging of waste water, and also supplied ready mix-concrete F’c 200 kg/cm² at 28 days, 20 mm. aggregate of inert basaltic material and 12 cm. Rev.
Pouring of sill plate, perimeter walls and covering plate.
We supplied concrete F’c 300 kg/cm² at 28 days, 20mm limestone aggregate. 14 cm Rev. and integral waterproofing.
We supplied TS (Tensile strength) concrete for vehicular platforms.
Pouring of control structures and trapezoidal section for the discharge channel.
We supplied concrete F’c 350 kg/cm² at 28 days, 20 mm aggregate and 14 cm. Rev.